Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com

In the Town of Jupiter, docks, boat lifts and seawalls are permitted as marine structures through the Building Department, and applications are filed online in the Jupiter Community Development System (JCDS) portal. A typical package includes a signed and sealed survey dated within six months that shows the mean high water line, existing and proposed structures, and any mangroves or rip-rap; engineer signed and sealed plans with pile depths and material specs; and the required checklist and forms. Depending on the site, the Town also expects proof of Florida DEP, South Florida Water Management District, or U.S. Army Corps of Engineers authorization, and HOA approval in deed-restricted communities. Projects that exceed the Town's dock length or configuration limits need a dock waiver from Planning and Zoning before the building permit can move. Unincorporated lots go through Palm Beach County instead. America Strong Construction pulls marine permits under Florida Specialty Marine Contractor License #SCC131152860, coordinates the engineer and surveyor, answers reviewer comments, and then builds what was approved. Call (561) 284-9628 to start.
For permit preparation and digital submittals on Jupiter and Treasure Coast marine projects, America Strong Construction works with A+ Permits as our preferred permitting partner. A+ Permits helps assemble forms, track JCDS status and keep agency correspondence organized, while ASC stays the licensed contractor of record responsible for the plans, the build and the inspections. That split keeps paperwork moving while our crews stay focused on pile driving, framing and lift installs. Projects along the Loxahatchee River, near Jupiter Inlet, or on the Intracoastal often run Town and state or federal reviews at the same time, and a coordinated package cuts down on revise-and-resubmit cycles. Whether you're replacing a dock, adding a boat lift, or repairing a seawall, call (561) 284-9628 and we'll tell you which approvals your site is likely to need. Learn more about our dock builder in Jupiter, our boat lifts, and our seawall and rip-rap work.
Town of Jupiter marine structure review typically looks for a complete package, not a sketch. Depending on the project, that can include property surveys, site plans showing setbacks and existing structures, engineered dock or seawall drawings, lift specifications, construction methods, and environmental attachments such as turbidity controls, mangroves, and seagrass documentation. We assemble and coordinate the contractor side, work with licensed engineers for stamped plans when required, and keep you informed as reviews progress.
Jupiter projects often involve more than one desk: the Town of Jupiter for local marine structure review; Palm Beach County depending on location and scope; the Florida Department of Environmental Protection; South Florida Water Management District; and the U.S. Army Corps of Engineers, especially on Loxahatchee River and federally associated waters. Inlet-adjacent and open Intracoastal lots tend to draw more environmental scrutiny, while canal communities still need complete local packages.
1. On-site or on-water assessment — depth, existing structure, access, and project goals. 2. Survey and design — boundary or topo work as needed, with engineer engagement when stamped plans are required. 3. Permit package assembly — Town forms plus agency exhibits matched to docks, lifts, walls, or dredge scope. 4. Agency coordination — responses to comments, revisions, and sequencing. 5. Construction — pile driving, framing, lift installation, seawall or rip-rap, or dredging with turbidity controls. As a Specialty Marine Contractor, we coordinate the package and build what gets permitted under License #SCC131152860.
Jupiter’s waterfront includes calm canals and high-energy edges near Jupiter Inlet. Public shoreline work at the Jupiter Inlet Lighthouse Outstanding Natural Area, where America Strong Construction is the marine contractor for Bid Option 4 timber boardwalk package, shows how engineered pile-driven structures are built under real Inlet and agency constraints. Private docks and walls deserve the same discipline at residential scale: correct elevations, pile capacity, environmental controls, and drawings agencies can approve. Shortcuts in planning become delays or stop-work later.
Homeowners replacing an aging Jupiter dock or adding a boat lift; buyers assessing a waterfront property’s permit reality before closing; owners facing seawall failure or shoaled slips who need a sequenced plan; and commercial or HOA waterfront managers needing a licensed contractor to coordinate packages. We serve Jupiter, Tequesta, Jupiter Inlet Colony, Admirals Cove, Jonathan’s Landing, and nearby Palm Beach and Martin County waterfronts from our Hobe Sound shop. For digital permit coordination on Jupiter and Treasure Coast marine projects, America Strong Construction works with A+ Permits as a preferred permit collaboration partner.
Preferred Engineering Partner
Shoreline Engineering specializes in the design and permitting of docks, boathouses, seawalls, marinas, and other waterfront improvements throughout Florida and Alabama. Their team works closely with property owners and contractors to develop practical, buildable plans and navigate permitting requirements. As America Strong Construction's preferred engineering partner, Shoreline helps bring waterfront projects from concept to construction.
Do I need a permit to build or replace a dock in Jupiter? Yes. New docks, rebuilds, boat lifts and seawalls in the Town of Jupiter need a marine structure building permit, and many sites also need DEP, SFWMD or Army Corps approval. Call (561) 284-9628.
How far can a dock extend in Jupiter? On natural waterways, Town code generally limits docks to 50 feet from the mean high water line or 20% of the waterway width, whichever is less. Canal docks are generally set parallel to the seawall. Going beyond those limits requires a dock waiver.
What documents do I need? Usually a signed and sealed survey dated within six months, engineer-sealed plans, the Town checklist and forms, any required state or federal approvals, and HOA approval if your community has one.
How long does a Jupiter dock permit take? It depends on how complete the package is and whether DEP, SFWMD or Army Corps review is triggered. Town-only reviews move faster than projects that also need state or federal sign-off. We sequence the reviews so they run in parallel where we can.
Who pulls the permit? America Strong Construction pulls it under License #SCC131152860, with A+ Permits supporting the paperwork as our preferred permitting partner.
America Strong Construction, LLC
St. Lucie County, Martin County, & Palm Beach Counties
America Strong Construction, LLC | Hobe Sound, FL 33455 | +1-561-284-9628 | Serving St. Lucie, Martin, and Palm Beach Counties.
Copyright © 2026 America Strong Construction, LLC - All Rights Reserved.
Licensed & insured marine contractor · License #SCC131152860
Serving Port St. Lucie, Jensen Beach, Stuart, Palm City, Sewall's Point, Hobe Sound, Tequesta, Jupiter, and Palm Beach Gardens
Dock, Boat Lift, Seawall, Dredging Contractor