Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
Rip-rap installation, repair and maintenance for waterfronts in St. Lucie, Martin and Palm Beach counties. Shoreline work matched to site conditions and approved plans.
Start with a discussion of your property, existing structures, access and project goals. Review the site and available records, define the scope, coordinate engineered plans and applicable permits, then organize construction around the approved design. Requirements and timing vary by waterway and jurisdiction; approvals are not guaranteed.
Discuss the complete project rather than treating each component in isolation. Where appropriate, coordinate docks, boat lifts, boathouses, seawalls, rip-rap and dredging around the site, access and approved scope.
Hobe Sound, Stuart, Palm City, Sewall's Point, Port Salerno, Jensen Beach, Rio, Sailfish Point, Hutchinson Island, Port St. Lucie, Jupiter, Tequesta, Palm Beach Gardens and Singer Island; serving Martin, St. Lucie and Palm Beach counties.
No. Wave exposure, current, slope, access, habitat and the existing shoreline structure influence suitability. The design and permit review determine whether rock revetment or another approach is appropriate.
Can rip-rap be considered alongside seawall work? It may be considered where the engineered design and approvals allow. Rip-rap and seawalls are different systems; do not assume that rock alone resolves an existing structural problem. What should I share before a shoreline assessment? Send the town and photos showing erosion, the shoreline edge and access for equipment. Existing permit and survey records help define what needs further review.
Anthony Clements | America Strong Construction, LLC | Hobe Sound, FL.
Florida Specialty Marine Contractor License #SCC131152860.
Discuss your project
Call (561) 284-9628
America Strong Construction, LLC installs and maintains rip-rap rock revetments for properties in St. Lucie, Martin, and Palm Beach Counties. Our state-licensed, fully insured team builds eco-friendly rip-rap barriers that fight shoreline erosion and protect against storm surge with natural, long-lasting durability. We customize each revetment to your waterfront's unique needs, in compliance with Florida Department of Environmental Protection and U.S. Army Corps of Engineers regulations.
Inlet currents, tidal exchange, and boat wake can hit river and Intracoastal edges hard. Rip-rap revetments and rock armor stabilize banks where a vertical wall is not preferred or permitted. We place rock to engineered or agency-approved grades with appropriate turbidity controls, and can coordinate shoreline armor with docks and other marine structures.
From new installations to resetting and topping up existing revetments, our craftsmanship protects your property while keeping the shoreline's natural look. Already have a wall? Rock at the toe of a seawall can add scour protection, and we scope both together when they overlap.
Rip-rap typically requires marine structure review by the town or county. Depending on location and impact, Florida DEP, SFWMD, the U.S. Army Corps of Engineers, and the county may also review. We coordinate surveys, engineered plans when required, and permit packages so work starts with clear approvals. See plans & permitting for process details.
Licensed Specialty Marine Contractor #SCC131152860, fully insured, and experienced across seawalls, rip-rap, docks, lifts, and dredging when projects overlap. Based in Hobe Sound, we work from Port St. Lucie down to Palm Beach Gardens, with our own barges and marine equipment for rock placement from the water.
Is rip-rap better than a vertical seawall? It depends on wave energy, setbacks, upland use, and approvals. Rip-rap works well where a vertical wall is not preferred or permitted. See our Seawalls page for wall options. Can rip-rap be added in front of an existing seawall? Often, yes. Toe rock can reduce scour at the base of a wall; we confirm it against site conditions and permits.
Do you repair existing rip-rap? Yes. We reset displaced rock and add stone where a revetment has settled or washed out. Do I need a permit for rip-rap? Usually, yes. Rock is placed to engineered or agency-approved grades, with turbidity controls, after town or county and, where needed, Florida DEP, SFWMD, and Army Corps review. What areas do you serve? Port St. Lucie to Palm Beach Gardens across St. Lucie, Martin, and Palm Beach Counties, from our base in Hobe Sound. Call (561) 284-9628 or request a quick quote to start.
Highly desired Jupiter, FL. The rich blues back through the Loxahatchee River and down the Intracoastal. Jupiter is home to many of our Docks, Seawall and Boat Lift projects. Learn more about seawall services in Jupiter, FL.
America Strong Construction, LLC
St. Lucie County, Martin County, & Palm Beach Counties
Hobe Sound to Palm Beach Gardens, FL
Dock, Boat Lift, Boathouse, Seawall, Dredging Contractor
Copyright © 2026 America Strong Construction, LLC - All Rights Reserved.
Licensed & insured marine contractor · License #SCC131152860
Serving Hobe Sound, Stuart, Palm City, Sewall's Point, Port Salerno, Jensen Beach, Rio, Sailfish Point, Hutchinson Island, Port St. Lucie, Jupiter, Tequesta, Palm Beach Gardens and Singer Island
Dock, Boat Lift, Boathouse, Seawall, Dredging Contractor